Arzum Construction in Slough
Arzum Construction
A project which was supposed to take 6 weeks is still not complete after 5 months and I have had to arrange to finance a new contractor to finish the project. Mr Salah Kamel walked off the project leaving doors unpainted, a driveway full of rubble and other materials as well as an overflowing skip. He damaged carpets and renaged on supplying new carpets.
The fire doors were the wrong ones, the shower room was offplan and smaller than agreed, the skirting has joins in the middle on two of the main walls which they havent even attempted to disguise, plasterwork has trowel lines and chips, doors frames and woodwork are cracked, the new staircase has three different types of paint and is unpainted in some areas and roof tiles where the velux windows were added have been left uneven and loose.
Unit A2, Deseronto Industrial Estate, St. Marys Rd, Langley
Slough SL3 7EW